English
繁體中文
中文
English
English
繁體中文
中文
English装配工艺
Solution
Delivery in 60 days, 4 robots operating at a 55s cycle, applying 85NM torque to 16 bolts, carbon fiber arms resist twisting, passive follow-along conveyor
Delivered in 60 days, 2 robots work at a 55s cycle, applying 160NM torque to 8 bolts, carbon arms resist twisting, passive follow conveyor
Delivered in 90 days, 2 robots with a 51-second cycle, handling 8 types of glass each for the front and rear windshields, completing cleaning and primer processes through the primer system.
Delivered in 80 days, 2 robots operate at a 50-second cycle, handling front labels, back labels, and other types of tags. Incoming materials are sorted by gravity, and robot force control ensures labeling quality.
Delivered in 30 days, 2 robots with a 50-second cycle complete various structural adhesive applications using fixture mechanical positioning.